Powermore successfully supplied and installed 35kV current limiting reactors for the 500kV Van Phong substation. The project was successfully energized in November 2022.
The project of Van Phong 500kV substation has a capacity scale of 2 transformers 500/220kV – 900MVA. The 220kV connection line has a total length of about 26.2km, of which, 2 circuits are connected from Van Phong 500kV substation to Van Phong 220kV substation, 2 circuits are connected to the existing Van Phong – Tuy Hoa 220kV transmission line.
Van Phong 500kV substation, together with Van Phong – Vinh Tan 500kV transmission line project, will secure electricity supply forKhanh Hoa province and neighboring provinces; meeting the socio-economic development needs of the key economic region of the South Central Coast; evacuating energy of Van Phong 1 BOT Thermal Power Plant and renewable energy power plants in Ninh Thuan, Khanh Hoa and Phu Yen provinces.
Van Phong 500kV substation, together with Van Phong – Vinh Tan 500kV transmission line project, will secure electricity supply forKhanh Hoa province and neighboring provinces; meeting the socio-economic development needs of the key economic region of the South Central Coast; evacuating energy of Van Phong 1 BOT Thermal Power Plant and renewable energy power plants in Ninh Thuan, Khanh Hoa and Phu Yen provinces.
PowerMore takes pride in being a trusted supplier of current limiting reactors for the 500kV Van Phong substation, where their role is crucial due to the high short circuit power generated by the 500kV transformers. These reactors are critical in reducing short circuit current in the substation’s medium voltage section, ensuring safe and efficient operations.