Project Overview
Project Name: Fengmiao 1 Offshore Wind Farm – Offshore Substation
Project Description: PowerMore provides specialized technical services supporting the installation and commissioning of major electrical equipment at the Fengmiao 1 Offshore Substation. The scope of work focuses on electrical testing, vacuum processing, insulating oil filtration, and equipment acceptance testing prior to energization and operation.
| Category | Details |
|---|---|
| Industry / Sector | Offshore Wind Power |
| Project Type | Offshore Substation |
| Voltage Level | 220 kV |
| Main Equipment | 305 MVA Power Transformers, 85 MVAr Shunt Reactors |
| Location | Fengmiao Offshore Wind Farm, Taiwan |
| Project Year | 2026 |
PowerMore’s Scope of Work
PowerMore delivers specialized technical services for the installation, testing, and commissioning of the offshore substation’s main electrical equipment.
✓ Pre-installation electrical testing of primary equipment for the shunt reactors.
✓ On-site acceptance and commissioning testing of primary electrical equipment for the power transformers and shunt reactors.
✓ Vacuum processing and insulating oil filtration for the power transformers.
✓ Vacuum processing and insulating oil filtration for the shunt reactors.
Equipment Covered
- 02 GE power transformers – 305 MVA each
- 02 HD Hyundai Electric shunt reactors – 85 MVAr each
Project Highlights & Value
Offshore Substation Execution
The technical scope is carried out in an offshore environment, where stringent requirements for safety, quality control, coordination, and project schedule must be consistently maintained throughout the execution process.
Comprehensive Testing and Commissioning of Main Electrical Equipment
PowerMore’s scope covers key stages from pre-installation testing and on-site acceptance testing to vacuum processing and insulating oil treatment. These activities help verify equipment condition and readiness before energization and subsequent operation.
Experience with High-Capacity Electrical Equipment
The project involves major high-voltage equipment, including:
- 02 power transformers rated at 305 MVA each
- 02 shunt reactors rated at 85 MVAr each
The scope demonstrates PowerMore’s capability to support the installation and commissioning of high-capacity electrical equipment for offshore power infrastructure.
Supporting Equipment Readiness for Energization
PowerMore’s technical services contribute to ensuring installation quality, verifying equipment performance, and meeting commissioning and acceptance requirements for the offshore substation’s main electrical equipment before energization and commercial operation.