Project Overview
Project Name: Baltica 2 Offshore Substation Project
Project Description: PowerMore provides specialized technical services supporting the installation, testing and commissioning of major electrical equipment at the offshore substations of the Baltica 2 project. The scope of work includes electrical testing, vacuum treatment, insulating oil filtration and equipment acceptance prior to energization and operation.
| Category | Details |
|---|---|
| Industry / Sector | Offshore Wind Power |
| Project Type | Offshore Substation (OSS) |
| Voltage Level | 275 kV (Baltica 2 transmission voltage) |
| Main Equipment | 225 MVA power transformers and 140 MVAr shunt reactors |
| Project Scale | 4 offshore substations, each rated at 375 MW |
| Location | Baltic Sea, Poland |
| Implementation Period | 2026 |
PowerMore’s Scope of Work
PowerMore carries out specialized technical services to support the installation, testing and commissioning of major electrical equipment across the Baltica 2 offshore substations.
✓ Pre-installation testing of primary electrical systems for power transformers and shunt reactors.
✓ Site acceptance testing of primary electrical systems for power transformers and shunt reactors.
✓ Vacuum treatment and insulating oil filtration for power transformers.
✓ Vacuum treatment and insulating oil filtration for shunt reactors.
Equipment Covered
- 8 × 225 MVA power transformers (2 transformers per OSS)
- 4 × 140 MVAr shunt reactors
- Equipment supplied by HD Hyundai Electric
Project Highlights & Value
Technical Services for a Large-Scale Offshore Substation System
PowerMore provides technical services for 4 offshore substations, each with a capacity of 375 MW, as part of one of Poland’s major offshore wind power developments.
The project requires technical execution in a demanding offshore power infrastructure environment, with a strong focus on equipment quality, testing accuracy and readiness for commissioning.
Comprehensive Testing and Commissioning Support for Major Electrical Equipment
PowerMore’s scope covers critical stages from pre-installation testing through on-site acceptance testing, vacuum treatment and insulating oil processing.
These activities are carried out to help ensure that transformers and shunt reactors meet the required technical conditions before energization, commissioning and commercial operation.
Supporting High-Capacity Power Equipment
The technical scope covers major high-capacity electrical equipment, including:
- 8 × 225 MVA power transformers
- 4 × 140 MVAr shunt reactors
The scale and capacity of the equipment require controlled testing procedures, specialized technical expertise and strict compliance with project acceptance requirements.
Contributing to Installation Quality and Equipment Readiness
PowerMore’s technical services support the verification of equipment condition and installation quality before the main electrical equipment is placed into service.
Through electrical testing, vacuum treatment and insulating oil filtration, PowerMore contributes to ensuring that the transformers and shunt reactors are properly prepared for energization and reliable operation within the Baltica 2 offshore substation system.