1. Project Overview

Project Name: 110kV Neutral Earthing Reactor at Quang Trach 500kV Substation

Project Summary:
PowerMore successfully supplied and installed a 110kV Neutral Earthing Reactor (NER) for the Quang Trach 500kV Substation. The equipment was deployed as part of the substation’s electrical system, supporting safe and stable system operation.

Industry / Sector: Power Transmission / Substations / High-Voltage Electrical Equipment

Project Type: Supply and installation of Neutral Earthing Reactor

Voltage Level: 110kV

Location: Quang Trach 500kV Substation, Quang Binh, Vietnam

2. PowerMore’s Scope of Work

For this project, PowerMore carried out the following key activities:

  • Supplied a 110kV Neutral Earthing Reactor for the Quang Trach 500kV Substation.
  • Installed the Neutral Earthing Reactor at the substation.

3. Project Highlights & Value

The Quang Trach 500kV Substation is part of Vietnam’s power transmission infrastructure, where high-voltage electrical equipment must meet stringent requirements for operational safety, reliability, and system stability.

For this project, PowerMore successfully supplied and installed the 110kV Neutral Earthing Reactor at the substation. The equipment forms part of the electrical system at the Quang Trach 500kV Substation and contributes to reliable operation in accordance with the project’s technical requirements.

Newsletter Updates

Enter your email address below and subscribe to our newsletter

Leave a Reply

Your email address will not be published. Required fields are marked *

Zalo Zalo Linkedin Linkedin

Send Your Message

Contact Form